Water Plant Upgrade

Streamlined water plant upgrade in Probištip with prefabricated components, expert assembly, and hassle-free project coordination.
Custom-Engineered Hydrotesting Skid for GRP Pipes

Tom-Tech supplied a custom hydrotesting skid for Top Fibra, designed for smooth operation and precise high-pressure testing.
Boiler Feed Water Treatment

Complete water treatment unit for boiler feed, delivered under pressure with full in-house execution and seamless coordination
Integrated Ammonia Water Dosing Solution

Tom-Tech designed and installed a fully integrated ammonia water dosing system for GP Sistemi, built for reliability, safety, and efficiency
Plug in Pilot Plant for Wastewater Treatment

Tom-Tech engineered and built a modern pilot plant for Econvert Water & Energy, tailored for high performance and operational reliability.
UF Treatment Plant – 300 l/s in North Macedonia

Tom-Tech helped Kolektor Sisteh build a new plant in North Macedonia, ensuring seamless integration and efficient execution.
Water Distribution DN350 Pipeline Installation

Tom-Tech installed a hybrid stainless steel and PE pipeline for Kolektor Sisteh, overcoming steep slopes with a cableway system to ensure secure water transport.
Dosing System

Integrated dosing system designed for precision, efficiency, and easy maintenance in a compact, custom-built platform solution.
Custom Air Scrubber for Envitec Technologie GmbH

A high-performance scrubber by Tom-Tech efficiently treats vapors in the high-tech industry, ensuring reliability.